Obtain CONSUEL favorable opinion. Mandatory box since 09/01/2025 for CONSUEL inspections (new NF C 15-100 standard) when a generator is connected upstream of the consumption installation.
Case n°1: installation outside the main panel to ensure the protection of the existing installation.
Self-consumption PV installations with a three-phase electricity supply contract ≤ 18kVA.
New construction sites or modifications requiring a new CONSUEL.
Connection of the generator upstream of the protection devices of a terminal circuit (§ 551.7 / § 551.7.2).
Mandatory CONSUEL – application from 09/01/2025 (NF C 15-100).
Case n°1: independent box, outside the consumption panel.
Rating: 32A for 12-18kVA three-phase.
Compliance: In_protection ≤ Ir_AGCP; S1 ≥ section required by In_protection.
Prohibition: no connection to a terminal circuit.
4P 32A thermal-magnetic circuit breaker (12-18kVA, 230 V).
Double 35 mm² terminals (input / output) for a clean incoming-outgoing connection with large sections (AGCP ↔ box ↔ S1 connection).
Case n°1 markings + simplified diagram on instructions/cover.
Place the box as close as possible to the AGCP, upstream of the main panel.
Check the Ir of the AGCP and confirm that 32A ≤ Ir_AGCP.
Size the S1 connection according to In_protection.
Prepare the technical file for Case n°1 (CONSUEL platform).
Choosing ALLO SOLAR means choosing reliability. Our boxes are designed for Case n°1 and comply with NF C 15-100 applicable since 09/01/2025.
Certified components, clear markings, simple instructions: everything is ready for a clean installation near the AGCP. E
If you wish, our technical team will review the key points with you for a favorable CONSUEL opinion.